Case study
Three garments, one release date.
A production house needed set crew tees, launch hoodies and a retail fan drop, all timed to the release calendar.

Requirement → recommendation → result
1Requirement
Crew tees for a 120-person unit, 300 launch hoodies with poster art, and a 500-piece fan drop under the film's label.
2Recommendation
180 GSM bio-wash crew tee, screen print; heavyweight hoodie with DTF poster art; 240 GSM oversized fan tee with woven neck label and hang tag.
3Production
Crew tees first, hoodies for the launch date, fan drop timed to release week. Artwork handled under NDA.
4Result
Fan drop sold through at the premiere; the hoodie became the cast's press-tour uniform.
Title and studio withheld under NDA.